人造草坪篮球场选择什么样的草坪来施工

作者: 来源: 日期:2020/4/19 17:12:41 人气:1408
    人造草坪篮球场地的基层有沥青混凝土和水泥混凝土两种。篮球场地的施工:重要是控制好排水方向和场地的平整不能出现凹凸不平状,施工时可以用5mx5m方格网控制(人工铺沥青混凝土),或在水泥混凝土施工时,支立好模板的高程,用模板控制。
    The base of the artificial turf basketball court is made of asphalt concrete and cement concrete. The construction of basketball court: it is important to control well the drainage direction and the leveling of the ground without any bumps and bumps. During the construction, 5mx5m grid can be used to control (manually spread asphalt concrete), or the elevation of the formwork can be set up and controlled by the formwork.

       在人造草坪面层施工时,首先要选择草苗长度在11~12mm长的人造草,不要选用30mm以上的人造草,这种短草苗的人造草铺装后不用充填砂和黑胶粒。但人造草坪的安装需要由专业人员,采用专门的设备进行。人造草来料是整卷供货,按场地尺寸进行切割,草坪铺装接口,要用专用接口带,并涂胶水粘接,接口带宽度为20~30cm,也就是在缝的两侧各有不少于10~15cm的接口带,短草苗的草坪接缝最好不用机械缝制的方法接,防止接缝处凸起,点的距离为50cm,铺后,可用人工碾,碾压1~2遍,使接缝和粘接点粘牢。
       In the construction of artificial turf surface, first of all, the artificial grass with the length of 11~12mm should be selected instead of the artificial grass with the length of more than 30mm. However, the installation of artificial turf needs to be carried out by professionals with special equipment. Incoming supply is the whole volume, artificial grass cutting according to the size of venue, the lawn shop interface, with a special interface zone, and the adhesive glue, interface zone width is 20 ~ 30 cm, which is in the seam has not less than 10 ~ 15 cm on both sides of the interface zone, short grass lawn sewn seams best without mechanical method, convex, prevent the joint point of the distance of 50 cm, after the shop, by manual grinding, crushing 1 ~ 2 times, make joint and contact cement.

       人造草坪铺装的时间和温度有很大关系,温度太低时铺装,在夏季严热时会出现鼓胀现象,施工季节、时间、气温,应选择在常温状态下进行操作最好。运动场休闲人造草坪多少钱一平方就找运之家。
       The time that the man-made lawn shop installs and temperature have very big concern, when temperature is too low, the shop is installed, in the summer when severe heat appears bloat phenomenon, construction season, time, air temperature, should choose to undertake operation is best under normal temperature condition.